Norrfield

Three weeks of grid checks, done by lunch.
Customer
Norrfield Grid
Sector
Energy, Nordics
Uses
Halden agent, API
Since
2025
The work
Every new wind farm, data hall or charging depot has to be checked against Norrfield’s grid before it connects. Each study took an engineer three weeks. Now Halden runs it twice, by lunch, and the engineer signs.
The problem
Connection requests tripled in two years. Twelve engineers spent most of their time loading models and rerunning contingencies.
A missed overload is not a typo. It is a line that trips in January.
What changed
Halden loads the network, runs N-1 on every line and reruns each result on a second solver. Where the two disagree, it stops.
The engineer gets the study, every source and the one or two lines that need judgement.
A study in progress: two overloads found, one sent to an engineer.
The wind farm fits, except at winter peak: line 7 reaches 118% under N-1.
The same study, called from Norrfield’s planning tool through the API.

A data hall in Gävle, connected after a one-day study.

Control room, Stockholm.
The eval built from 240 of Norrfield’s past studies, rerun on every release.
Twelve months on
Year one.
4
hours
For a connection study that took three weeks.
212
studies
Run, checked twice and signed by an engineer.
0
missed overloads
Every disagreement went to a person first.
“It tells us what it checked and what it doubts. That is why we let it near the grid.”

Peter Lindqvist
Head of grid planning, Norrfield