
07
/ 08
Vantor Rail

Every repair log checked against the standard.
Customer
Vantor Rail
Sector
Rail, United Kingdom and Ireland
Uses
Halden agent, review queue
Since
2025
The work
Every train that leaves a Vantor depot carries a stack of repair logs. Supervisors checked a sample against the maintenance standard. Now Halden checks every log twice before the train leaves, and a supervisor signs.
The problem
Three depots, 260 units and logs written at the end of night shifts. Supervisors could check one log in ten.
A worn brake pad is not a paperwork problem. It is a train that should not be in service.
What changed
Halden reads each log, checks every measurement against the standard and checks its own reading a second way. Where the two disagree, the unit waits.
The supervisor gets the logs that need a decision, with the clause of the standard next to each one.
A night’s logs in progress: one brake pad below the limit, sent to a supervisor.
The wind farm fits, except at winter peak: line 7 reaches 118% under N-1.
The same check, called from Vantor’s maintenance system through the API.

The Depot 3 extension, under construction.

The morning handover at Depot 3.
The eval built from 1,000 signed repair logs, rerun on every release.
Twelve months on
Year one.
41
seconds
For a supervisor to sign a checked log.
100
%
Of repair logs checked, up from one in ten.
0
missed limits
Every reading below the limit reached a supervisor.
“Every repair log is checked against the standard before the train leaves the depot.”

Daniel Owusu
Head of maintenance, Vantor Rail
Research
Saga Nyström
Deployment
Leo Tran, Daniel Cho
Vantor Rail
Three depots, 260 units
Products
Agent, review queue
Next story,
08
/ 08
